Mobile
Log In Sign Up
Home > chinese-english > "dam height" in English

English translation for "dam height"

坝高

Related Translations:
karaj dam:  卡拉季坝
high dam:  大水高坝
stoplog dam:  叠梁坝
dam retting:  水坑沤麻
farm dam:  农用小土坝小型灌溉坝
coulee dam:  古力丹
torquay dam:  托基水库
dam breach:  垮坝
wilson dam:  威尔逊坝
dam busters:  大坝毁灭者敌后大爆破
Example Sentences:
1.Numerical analysis of seepage field in mijiangou tailings dam to be designed to increase the dam height
米箭沟尾矿坝加高方案渗流场数值分析
2.The experimental results in a physical model are adopted to verify the simulated damming heights
采用模型试验资料验证了壅水高度计算结果。
3.That the predicted values of damming height agree well with the exprimental results proves the validity of the numerical model
壅水高度的计算结果与模型试验资料吻合较好,证明了数值模型是可靠的。
4.The project is 156 m dam height , 877 m normal impounded level and 760 mw installed capacity . minjiang river benches almost conversely in shajinba reach and makes the right bank a thin and weak ridge , which is a syncline geological structure
岷江在沙金坝河段形成一个近180的河曲,使右岸形成三面被河曲围抱的条形山脊,构造上为一完整沙金坝向斜,工程区水工建筑物都布置在右岸山脊内。
5.Nuozadu hydro - electrical power station , which is 261 . 5 m dam height and 5 , 850 mw installed capacity , is planned to build on the middle - lower reaches of lancang river near shimao city , yunnan province . it is planned to adopt rockfill dam and underground powerhouses in the left bank . the underground cavities mainly include three large cavities
澜沧江糯扎渡水电站拟建坝高261 . 5m ,装机容量5850mw ,采用左岸地下发电系统,由主厂房、主变室、尾水调压室以及尾水洞等构成庞大而复杂的地下洞室群。
6.Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream , total installed capacity 252mw , total reservoir capacity 430 million - m3 , maximum dam height 57m , length of dam axis 439 . 5m , total static investment rmb 623 . 48 million ( 1998 price )
高坝洲水利枢纽是清江流域三级水电站的最下游一级水电站,电站总装机容量252mw ,总库容4 . 3亿m ~ 3 ,最大坝高57m ,坝轴线长439 . 5m ,静态总投资( 1988年价格) 62348万元。
7.Because of the complexity of calculation result data , and in order to simplify the analysis of results , this paper only provides annual temperature isoline map of february , may , august and november during construction , temperature isoline map of the first , fifth , tenth , twentieth and thirtieth year during operation , duration curve of temperature and stress of typical point at different elevation , the maximal stress distribution along dam height , point at different elevation , the maximal stress distribution along dam height , and the maximal and minimal temperature and the maximal tensive stress and its position of every month
因计算结果数据量非常大,为便于成果分析,本文仅给出施工期每年2 、 5 、 8 、 11月份和运行期第1 、 5 、 10 、 20 、 30年的温度等值线图,坝体不同高程典型点温度和应力历时曲线图,最大应力沿坝高分布图,逐月最高、最低温度和最大拉应力值及相应的位置等。
Similar Words:
"dam foundation investigation" English translation, "dam geology" English translation, "dam gradation" English translation, "dam ha" English translation, "dam heel" English translation, "dam huc quang" English translation, "dam in" English translation, "dam intake" English translation, "dam lake" English translation, "dam length" English translation